Skip to main content

Lanxess, Standard Lithium agree on next steps

Lanxess and Standard Lithium have signed an agreement under which the latter will conduct a front-end engineering design study to evaluate the economic viability and technical feasibility of an industrial-scale, battery grade, lithium carbonate plant at Lanxess’ site at El Dorado, Arkansas. This follows 20 months of testing at a pilot plant.

The final results are expected in Q4, the two companies stated. If the study is completed successful, Standard Lithium could build a plant at its own expense at one of the three sites in El Dorado.

Lithium advances for two in US

Standard Lithium has completed the installation of its industrial-scale, pre-commercial direct lithium extraction demonstration plant at Lanxess’s South Plant facility.
Subscribe to Standard Lithium